Railway Track Clip Applicator Unit

Railway Track Clip Applicator Unit

nan INR/Unit

Product Details:

  • Condition New
  • Power Source Hydraulic
  • Attributes Strong Durable Easy To Operate Consume Less Power
  • Click to View more
X

Railway Track Clip Applicator Unit Price And Quantity

  • 1 Unit
  • nan INR/Unit

Railway Track Clip Applicator Unit Product Specifications

  • Strong Durable Easy To Operate Consume Less Power
  • New
  • Hydraulic

Railway Track Clip Applicator Unit Trade Information

  • 10 Unit Per Week
  • 1 Week

Product Description

Railway Track Clip Applicator Unit is known for its reliability and precise design. It basically, acts as suitable holding medium between concrete sleeper and rail tracks. Clip applicator unit can effectively de clip and clip around sixteen clamps in every minute. In fact, it serves as the cost effective and time saving solution when compared to non automatic clipping or de clipping work. The entire structure of this machine has been developed in our production section. Convenient to maintain, this multipurpose equipment ensures about its high output level. What is more, it is capable of shifting on site unit to the nearest railway station at 20 kmph speed. Railway Track Clip Applicator Unit has huge demand in railway designing and maintenance department across in India and also around the world.

Features:
  • It can be operated at minimal cost.
  • Equipped with safety interlock arrangements
  • Application specific structure
  • Maximum 20 kmph working speed
  • It can be operated under harsh weather for its well built structure
  • Driven by diesel fueled engine
  • Available Capacity Range : 16 clips per min

Product Details:
  • Type of Machine: Clip Applicator - Semi Automatic Unit
  • Clipping Arrangement for Sleeper: Provided for Clipping 4 clips at a time
  • No of Clips fitted per min: 20 clips
  • Mode of Operation: Through RRC through a PLC
  • Safety Interlocks for accident free operation: Electrical Interlocks provided
  • Clipping Arrangement for Sleeper: Provided for Clipping 4 clips at a time
  • Braking System for the Unit: Provided with Hydraulic Brake
  • Max. Speed of the Trolley: 18mts/min
  • No. of Wheels on the Trolley: 4 nos
  • Min. Speed of the Trolley: 1 mts/min
  • Tools for Clipping: Provided
  • Tolls for De Clipping: Provided
  • Control Procedure for the unit: Through Hydraulic Operated Valves
  • Capacity of Diesel Engine: 20 hp
  • Fuel Used: Diesel
  • Type of Cooling: Water
  • Make of the Diesel Engine: Yanmar - Japan
  • Type of Start: Electric Start
  • Enclosure for the Unit: Provided
  • Control Panel: NA
  • Length of Trolley: 2.5 mts
  • Width of the Trolley: 2 mts
  • Working Height of the Trolley: 500 mm

Application : Required for servicing of rail tracks


Get in touch with us
RFQ Request For Quotation
Get Quotes For Your Buying Requirement. Tell Suppliers What You Need.
I agree to abide by all the Terms and Conditions of tradeindia.com